|
DF13-2 Topside Installation, 18,000T, 2019 |
|
QMW RUYA Jacket Mooring and Ballasting, 2025 |
|
CSE Zawtika 1E ZWP16,17,18,19 Jacket Loadout,2025 |
|
Technip FMB UP and QP Loadout, and Installation 4,300t & 4,800t, 2016 |
|
Lu Feng 7-2 Topside Installation and Lifting, 13,000T, 2014 |
|
Inch Cape JKT integrate,2025 |
|
COOEC LF12-3 Jacket loadout |
|
CSE Zawtika 1D WP13 Jacket Loadout |
|
CSE Zawtika 1D WP14 Jacket Loadout |
|
EP15-1 CEP Topside Loadout, 16,520T, 2022 |
|
ALNG2 Weighing 7,000te, 9,000te, 1,200te, 15,000te, 2021-2022 |
|
ALNG2 BOMSEC/QMW, SPMT Loadout, 2021 |
|
YINSON ANNA NERY FPSO module weighing, 2,000t/each, 2021 |
|
Boskalis Jack up and skidding, 800t, 2020 |
|
LS17-2 Hull Skidding and Loadout, 34,000T, 2020 |
|
DF13-2 Topside Loadout, 18,000T, 2019 |
|
Hong Kong Airport Skybridge, 3 x 2,000T, 2019 |
|
Marjan GCP DSF and 26x Pancakes Jack up, 400~2060T, 2022 |
|
LF15-1 Jacket Loadout 30,200T, 2022 |
© 2026 Ashburn Offshore Engineering (Tianjin) Co., Ltd. | All rights reserved
Privacy Policy | Cookie Policy